Logo

SiPAT

Pulilan-Annual-Audit-Report-2022.zip

2022 AAR · 12 files

PDF

01-Pulilan2022_Transmittal_Letters.pdf

265 · 151.6 KB
PDF

02-Pulilan2022_Cover.pdf

266 · 25.4 KB
PDF

03-Pulilan2022_Executive_Summary.pdf

267 · 131.1 KB
PDF

04-Pulilan2022_Table_of_Contents.pdf

268 · 90.3 KB
PDF

05-Pulilan2022_Flyleaves.pdf

257 · 46.5 KB
PDF

06-Pulilan2022_Part1-Auditor's_Report.pdf

258 · 192.1 KB
PDF

07-Pulilan2022_Part1-Mgmt_Responsibility_for_FS.pdf

259 · 247.7 KB
PDF

08-Pulilan2022_Part1-FS.pdf

260 · 131.0 KB
PDF

09-Pulilan2022_Part1-Notes_to_FS.pdf

261 · 470.1 KB
PDF

10-Pulilan2022_Part2-Observation_and_Recomm.pdf

262 · 2.3 MB
PDF

11-Pulilan2022_Part3-Status_of_PY's_Recomm.pdf

263 · 174.0 KB
PDF

12-Pulilan2022_Part4-Appendix.pdf

264 · 110.6 KB

Findings

Audit findings contained in this document.

No photocopy of delivered materials

Severity: LowRecommendation: Unknown

The district did not keep a copy of the delivery documentation for materials, so it cannot prove the materials were actually delivered.

Pulilan-Annual-Audit-Report-2022.zip

Pulilan · 2022

Missing Property Acknowledgement Receipt

Severity: ModerateRecommendation: Unknown

Purchased equipment did not have a property receipt documenting who received and is responsible for it.

Pulilan-Annual-Audit-Report-2022.zip

Pulilan · 2022

No travel order for fuel purchase

Severity: LowRecommendation: Unknown

Fuel was purchased without a travel order, so there was no documentation showing the travel or use was officially authorized.

Pulilan-Annual-Audit-Report-2022.zip

Pulilan · 2022

Required bidding and contract documents lacking

Severity: HighRecommendation: Unknown

A construction contract was paid without the full set of bidding and contract documents that define the project scope, schedule, quality controls, and award process.

Pulilan-Annual-Audit-Report-2022.zip

Pulilan · 2022

Missing statement of single largest completed contract

Severity: ModerateRecommendation: Unknown

Suppliers were paid without documented proof that they had completed a similar contract in the past, which is needed to confirm their qualifications.

Pulilan-Annual-Audit-Report-2022.zip

Pulilan · 2022

Missing BAC Secretariat certification on advertisement posting

Severity: ModerateRecommendation: Unknown

The district could not show proof that the required public advertisement for the procurements was actually posted.

Pulilan-Annual-Audit-Report-2022.zip

Pulilan · 2022

Abstract of quotation not signed by BAC Vice Chairman

Severity: ModerateRecommendation: Unknown

The summary of price quotations was missing the BAC Vice Chairman's signature, so the quotation evaluation was not fully certified.

Pulilan-Annual-Audit-Report-2022.zip

Pulilan · 2022

Invitations for price quotation not signed by required bidders/suppliers

Severity: HighRecommendation: Unknown

The required number of vendors did not sign the price quotation invitations, which undermines the completeness and fairness of the competitive quotation process.

Pulilan-Annual-Audit-Report-2022.zip

Pulilan · 2022

Statements of account not signed by the approving officer

Severity: ModerateRecommendation: Unknown

Fuel bills were paid without the required approving officer's signature on the statement of account, so the payment documentation was incomplete.

Pulilan-Annual-Audit-Report-2022.zip

Pulilan · 2022

Disbursement vouchers not signed by required officials

Severity: HighRecommendation: Unknown

Payment documents were processed without the required approving signatures, so there was no assurance that the proper officials authorized the payments.

Pulilan-Annual-Audit-Report-2022.zip

Pulilan · 2022

Inspection notifications not submitted within 24 hours

Severity: ModerateRecommendation: Unknown

After deliveries were accepted, the district did not notify inspectors within the required 24-hour period, reducing the reliability of the inspection process.

Pulilan-Annual-Audit-Report-2022.zip

Pulilan · 2022

Missing Inspection and Acceptance Reports

Severity: HighRecommendation: Unknown

Payments were made without the required reports demonstrating that goods and services were inspected, received, and accepted.

Pulilan-Annual-Audit-Report-2022.zip

Pulilan · 2022