SiPAT logo

SiPAT

Implementation of Infrastructure Projects Outside Approved Sites

Department of Public Works and Highways · 2023

Severity: HighRecommendation: Unknown

This summary was generated automatically from the source document and may contain errors. It is not an official interpretation and should not be relied upon as legal guidance. Review the original excerpt and source document to verify before citing or acting on it.

What Happened?

Category: Project ImplementationIssue: Non-compliance

Construction and flood control projects were built in completely different locations than what was officially approved in the budget.

Why It Matters

Recommended Actions

No recommendations are available for this finding yet.

Original Audit Finding Excerpt

"Flood control structure was implemented at a location other than the site stated and approved in GAA for CY 2023."

Source Document

09-DPWH2023_Part2-Observations_and_Recomm.pdf

2023 AAR · 13 files