SiPAT logo

SiPAT

Delivery of heavy equipment accepted by unauthorized personnel

Department of Public Works and Highways · 2023

Severity: ModerateRecommendation: Unknown

This summary was generated automatically from the source document and may contain errors. It is not an official interpretation and should not be relied upon as legal guidance. Review the original excerpt and source document to verify before citing or acting on it.

What Happened?

Category: Property and Asset ManagementIssue: Internal Control Deficiency

The office allowed the wrong person to accept a heavy equipment delivery instead of the proper supply officer, weakening internal control over property receipt.

Why It Matters

Recommended Actions

No recommendations are available for this finding yet.

Original Audit Finding Excerpt

"The said delivery was acknowledged, with much regret, the fault was that the Office made in allowing another personnel, other than the Supply Officer, to accept the delivery of the heavy equipment. The one who accepted the delivery was a designated alternate Inspection Officer for heavy Equipment."

Source Document

DPWH2023_AAPSI.pdf

2023 AAR · 13 files