Missing Detailed Estimates in Program of Work

Department of Public Works and Highways · 2023

Severity: ModerateRecommendation: Unknown

This summary was generated automatically from the source document and may contain errors. It is not an official interpretation and should not be relied upon as legal guidance. Review the original excerpt and source document to verify before citing or acting on it.

What Happened?

Category: Procurement ComplianceIssue: Non-compliance

The breakdown of costs for a steel tank was missing from the project plan. The office prepared it later and admitted the error.

Why It Matters

Recommended Actions

No recommendations are available for this finding yet.

Original Audit Finding Excerpt

"A copy of the the detailed estimates for the fabrication of one unit Stainless Steel Tank (1.7mx3m Horizontal Tank)-6.809 cu.m. capacity with steel stand which is the basis for the lump sum cost. This office regret that it was not not included in the original program of work."

Source Document

DPWH2023_AAPSI.pdf

2023 AAR · 13 files